Anchor Design - Scarborough FPU
Working on behalf of McDermott in Australia, NGI performed the detailed geotechnical design of the suction anchors to moor the Scarborough Floating Production Unit, which will process the natural gas before it is transported back to shore.
Finite element analysis of suction anchor ( NGI)